Measured results and limitations are documented in the outcome evidence ledger.
Open path →Expansion requires evidence, capacity, governance, and configured controls.
A decision matrix that separates pilot success from scale readiness. It scores outcomes, support capacity, accessibility, training, State IT posture, data governance, funding, and court-approved adapter configuration.
Support burden, training load, staffing, and owner coverage are ready for a larger footprint.
Open path →Data governance, accessibility remediation, scope changes, and approval authority are clear.
Open path →State IT confirms auth, persistence, storage, audit, ingest, and court-approved adapter requirements.
Open path →Scale readiness matrix board
The matrix makes a hard distinction: a good pilot is evidence for a scale decision, not permission to scale automatically.
| Gate | Acceptance condition | Failure action |
|---|---|---|
| Evidence | Claims source-linked and limitations visible. | Narrow or retest. |
| Capacity | Support and training load forecasted. | Staff or slow rollout. |
| Accessibility | Blockers remediated or scoped. | Pause expansion. |
| State IT | Adapters and runtime modes approved. | Configure before production. |
- scale readiness matrix visible
- automatic expansion blocked
- capacity governance controls named
- adapter controls required
- scale gates explicit
The public package has a clear next step.
Human review remains the control point. This route is a public training record with fictional records and is not connected to a live court system.
- 1Audience path
Plan selection
- 2Public proof route
Account workspace
- 3Review standard
Settings and connections
- 4Forwardable next step
Review-safe outputs
This public walkthrough uses fictional training records. It does not submit filings, change court records, provide legal advice, or connect to a live court system. Production use requires authenticated access, configured adapters, audit logging, and court-approved integration boundaries.
