Choose the court unit, route families, user roles, filing types, and training record set for evaluation.
Open path →Close the meeting with concrete decisions instead of vague follow-up.
A pilot decision route that names scope, court unit, success metrics, State IT prerequisites, review boundaries, training records, and expansion gates.
Confirm identity, role claims, persistence, audit, storage, queue, filing, export, and ingest adapters.
Open path →Measure first-touch timing, correction clarity, queue age, packet readiness, slotting lag, and reserved decision aging.
Open path →Move from controlled pilot to broader rollout only after metrics and limitations are reviewed.
Open path →Meeting close checklist
The route gives the reviewer a precise next-step checklist they can circulate internally.
| Decision | Owner | Evidence needed |
|---|---|---|
| Court unit and role set | Court leadership | Pilot scope page. |
| Adapter readiness | State IT | Evaluation room and adapter matrix. |
| Metrics baseline | Operations lead | Pilot metrics page. |
| Limitations and go/no-go | Executive sponsor | Pilot limitations and print packet. |
- Scope decision named
- Technical prerequisites named
- Metrics named
- Limitations named
- Print packet available
The public package has a clear next step.
Human review remains the control point. This route is a public training record with fictional records and is not connected to a live court system.
- 1Audience path
Plan selection
- 2Public proof route
Account workspace
- 3Review standard
Settings and connections
- 4Forwardable next step
Review-safe outputs
This public walkthrough uses fictional training records. It does not submit filings, change court records, provide legal advice, or connect to a live court system. Production use requires authenticated access, configured adapters, audit logging, and court-approved integration boundaries.
