Mitigated by role quickstarts, clerk sequence, judge sequence, and a controlled pilot scope.
Open path →Name the risks before the reviewer has to ask.
A plain, forwardable risk register covering adoption, integrations, records, privacy, accessibility, procurement, pilot measurement, and support readiness.
Mitigated by adapter matrix, runtime mode review, audit matrix, and State IT data-flow review.
Open path →Mitigated by human review, limitations, accessibility review, plain-language filing repair, and support fallback paths.
Open path →Mitigated by scorecard, 90-day roadmap, success metrics, and owner-based follow-up.
Open path →Risk register board
The risk register is designed for forwarding. It avoids defensive copy and gives each risk a mitigation, owner, and proof path.
| Risk | Mitigation | Proof route |
|---|---|---|
| Adoption risk | Role quickstarts and limited pilot scope | /demo/change-management-plan/ |
| Integration risk | Adapter-gated production requirements | /demo/data-migration-readiness/ |
| Accessibility risk | Separate accessibility review lane | /demo/accessibility-review-room/ |
| Measurement risk | Scorecard and 90-day roadmap | /demo/pilot/90-day-roadmap/ |
- risk register board visible
- risk owner named
- mitigation mapped
- decision gate named
- public trust lane included
The public package has a clear next step.
Human review remains the control point. This route is a public training record with fictional records and is not connected to a live court system.
- 1Audience path
Plan selection
- 2Public proof route
Account workspace
- 3Review standard
Settings and connections
- 4Forwardable next step
Review-safe outputs
This public walkthrough uses fictional training records. It does not submit filings, change court records, provide legal advice, or connect to a live court system. Production use requires authenticated access, configured adapters, audit logging, and court-approved integration boundaries.
